Reference
E.-A. Eigbe, B. De Schutter, M. Nasri, and N. Yorke-Smith, "Sequence- and
time-dependent maintenance scheduling in twice re-entrant flow shops,"
IEEE Access, vol. 11, pp. 103461-103475, 2023.
Abstract
Industrial and academic interest converge on scheduling flow shops with
sequence- and time-dependent maintenance. We posit that anticipatory,
integrated scheduling of operational and maintenance tasks leads to superior
performance to purely 'wait-then-fix' handling of the maintenance tasks.
Motivated by an industrial problem with (sequence dependent) setup times,
maximum separation constraints, and a combination of sequence- and time-
dependent maintenance tasks, this paper introduces an integer programming
solution, a constraint programming solution and a heuristic solution based on
list scheduling. The motivating use case provides a unique combination of
concerns that is to the best of our knowledge, not yet studied in the
literature. We build on existing work where we can by extending models for
sequence-dependent maintenance scheduling to accommodate sequence- and
time-dependent maintenance scheduling and also propose other new models. We
show the relative performances of our methods through empirical evaluations and
also show significant improvements - up to 25% reduction in makespan - when
compared to a reactive scheduling approach that does not consider maintenance
in its planning. Based on our evaluations on exact methods, constraint
programming models scale better than mixed integer programming models for this
problem.
Publisher page
Downloads
BibTeX
@article{EigDes:23-011,
author = {Eigbe, Eghonghon-Aye and De Schutter, Bart and Nasri, Mitra and
Yorke-Smith, Neil},
title = {Sequence- and Time-Dependent Maintenance Scheduling in Twice
Re-Entrant Flow Shops},
journal = {IEEE Access},
volume = {11},
pages = {103461--103475},
year = {2023}
}