Reference
Z. Su and B. De Schutter, "Optimal scheduling of track maintenance activities
for railway networks,"
Proceedings of the 15th IFAC Symposium
on Control in Transportation Systems (CTS 2018), Savona, Italy, pp.
386-391, June 2018.
Abstract
We consider optimal scheduling of track maintenance activities for a railway
network divided into sections. The goal is to find an optimal time schedule for
the maintenance activities and optimal routes for the maintenance crew
(including all necessary equipment and technicians) that minimize the total
setup costs and the travel costs over the whole planning horizon. The
maintenance time budget, which can be the same, different, or flexible for each
period, and the minimum time to maintain a section are also taken into account.
We recast the track maintenance scheduling problem with three different
settings as three variants of the Capacitated Arc Routing Problem with Fixed
cost (CARPF), which are solved by transforming them into three node routing
problems. The proposed approach is demonstrated using a case study of a part of
the Dutch regional network.
Publisher page
Downloads
BibTeX
@inproceedings{SuDeS:18-007,
author = {Su, Zhou and De Schutter, Bart},
title = {Optimal Scheduling of Track Maintenance Activities for Railway
Networks},
booktitle = {Proceedings of the 15th IFAC Symposium on Control in
Transportation Systems (CTS 2018)},
address = {Savona, Italy},
pages = {386--391},
month = jun,
year = {2018}
}