Reference
J. M. Maestre,
M. D. Doan, D. Muñoz de la Peña,
P. J. van Overloop, T. Keviczky,
M. A. Ridao, and B. De Schutter, "Benchmarking
the operation of a hydro power network through the application of agent-based
model predictive controllers,"
Proceedings of the 10th
International Conference on Hydroinformatics (HIC 2012), Hamburg,
Germany, 8 pp., July 2012. Paper HIC2012_0338.
Abstract
This paper presents a comparison between a decentralized and a distributed
model-based predictive controller on a hydro power valley (HPV) benchmark
recently proposed. The HPV is composed by three lakes and a river that is
divided in six reaches that terminate with dams equipped with turbines for
power production. The lakes and the river reaches are connected in three
different ways: by a duct, ducts equipped with a turbine, and ducts equipped
with a pump and a turbine. The river is fed by upstream inflows and tributary
flows. In order to test the controllers, the following test scenario is
considered: the power output of the system should follow a given reference
while keeping the water levels in the lakes and at the dams as constant as
possible. Finally, a 24 hour simulation for the two controllers has been
carried out in order to compare both methods using several performance indices.
Downloads
BibTeX
@inproceedings{MaeDoa:12-007,
author = {Maestre, Jos{\'{e}} M. and Doan, Minh Dang and Mu{\~{n}}oz de
la Pe{\~{n}}a, David and van Overloop, Peter Jules and
Keviczky, Tam{\'a}s and Ridao, Miguel A. and De Schutter,
Bart},
title = {Benchmarking the Operation of a Hydro Power Network Through the
Application of Agent-Based Model Predictive Controllers},
booktitle = {Proceedings of the 10th International Conference on
Hydroinformatics (HIC 2012)},
address = {Hamburg, Germany},
month = jul,
year = {2012},
note = {Paper HIC2012\_0338}
}