Fixed-Profile Load Scheduling for Large-Scale Irrigation Channels

Reference

Y. Li and B. De Schutter, "Fixed-profile load scheduling for large-scale irrigation channels," Proceedings of the 18th IFAC World Congress, Milan, Italy, pp. 1570-1576, Aug.-Sept. 2011.

Abstract

The problem of fixed-profile load scheduling is considered for large-scale irrigation channels. Based on the analysis of the special structure of a channel under decentralised control, a predictive model is built on a pool-by-pool basis and a decomposition strategy of the scheduling problem is provided. The decomposition avoids excessive memory requirements in building the predictive model of the controlled plant and solving the formulated optimisation problem.

Publisher page

Downloads

BibTeX

@inproceedings{LiDeS:11-019,
   author    = {Li, Yuping and De Schutter, Bart},
   title     = {Fixed-Profile Load Scheduling for Large-Scale Irrigation
                Channels},
   booktitle = {Proceedings of the 18th IFAC World Congress},
   address   = {Milan, Italy},
   pages     = {1570--1576},
   month     = aug # {--} # sep,
   year      = {2011}
   }


Go to the publications overview page.

This page is maintained by Bart De Schutter. Last update: March 16, 2026.